RFI form for site hoarding works, itemized by detailed location & length, routed for direct RE/RTO verification.
Details
Site Engineer/Supervisor submits RFI No, requested inspection date/time, drawing reference, and general description/location, listing each hoarding segment with location/length. Contractor checks each item first, then routes directly to RE/RTO Inspector for verification and sign-off.