RFI form for tree removal, itemized per tree with girth/species, routed via EC before RE/RTO sign-off.
Details
Site Engineer/Supervisor submits RFI with drawing reference and general location, listing each tree by number, girth (m), and species. Contractor checks each item, request routes through EC for environmental clearance, then to RE/RTO Inspector for final verification.