The work at height operation checklist is a 3 part checklist which conducts a check on documentation, anchorage lines and physical checks on the WAH operation
Crane inspection checklist for applicant to fill in details regarding the mobile crane's construction standards including environmental conditions and supporting tools
A Hot-work equipment (Oxy-Acetylene Gas Cutting Equipment) checklist which allows the person in charge to conduct essential checks to ensure that the equipment is safe and safety measures are taken before the machinery is used.
A 4 part toolbox meeting form which allows the safety officer or Person In Charge to document discussions and important information during the toolbox meeting