RFI form for animal trapping/relocation activities by segment area, routed via EC before RE/RTO sign-off.
Details
Site Engineer/Supervisor submits RFI with drawing reference and general location, listing segments with area (m²), internal hoarding, and animal trap setup details. Contractor checks each item, routes through EC for environmental clearance, then to RE/RTO Inspector for final verification.