Steps to Conduct RE/RTO Inspection
- Log in to App.
- In the RERTO Inspection module, click Conduct RE/RTO Inspection.
- Click the + button on the inspection detail list.
- Fill in the following fields:
- Location
- Location Remark
- Inspection Scope
- Inspection Sub Scope
- Description of Work to be Inspected
- Select the RE 1 person. If needed, select RE 2 as well (optional).
- Attach documents, if any (maximum 10 attachments).
- Attach the RE/RTO Inspection Checklist (required):
- If you have previously submitted an inspection checklist in Records or My Tasks, it will appear in the list for selection.
- If you have not submitted one yet, click the CREATE button to create a new Inspection Checklist.
- Attach the Site Inspection Checklist (optional).
- Fill in the signature, then click SUBMIT.
- After submitting, the inspection request status will show as “Pending Confirmation” and will appear in the list beside the RE/RTO Inspection module calendar.
Available Actions on Submitted Inspection Requests:
VOID β Cancel an inspection request.
EDIT β Edit the inspection detail.
COPY β Duplicate the inspection detail (only available as long as it hasn’t been confirmed by the RE).
REMOVE β Remove the inspection request.
Note:
The checklist will only appear in the list if it has already been completed.